DELIVERABLES – RESEARCH REPORTS
Deliverables that are marked „public” in the following list are available for download (if already submitted). For information about all others please drop an email with your contact details, the related deliverable number and your question to the following email address: office@slim-project.eu. We will take care that you will be contacted by the related project partner in charge.
Deliverable | Title | Lead | Accessibility | Date |
---|---|---|---|---|
D2.1 | Explosive characterisation (1) Preliminary version of JWL Equation of State and effective energy for the explosives used in the project. Assessment of toxic fumes of commercial explosives. | UPM | Confidential | Okt.2018 |
D2.2 | Rock characterisation pre and post-blast. Procedure for rock characterisation. | LTU | Confidential | Okt.2018 |
D2.3 | Controlling rock fragment size distribution: large and small scale testing (1). Preliminary version of Blast characteristics and size distribution results for large and small scale test blasts. | UPM | Confidential | Okt.2018 |
D2.4 | Fragmentation prediction: numerical modelling. Critical analysis of numerical modelling results as a predictive tool | LTU | Confidential | Okt.2018 |
D2.5 | Explosive characterisation (2) Preliminary version of JWL Equation of State and effective energy for the explosives used in the project. Assessment of toxic fumes of commercial explosives | UPM | Confidential | Apr 2019 |
D2.6 | Controlling rock fragment size distribution (large and small-scale testing) (2). Final and complete version of Blast characteristics and size distribution results for large and small scale test blasts | UPM | Confidential | Apr 2019 |
D3.1 | Near-field seismic model for rock damage. Numerical model for rock damage prediction and recommendations of drilling and loading for damage minimization | UPM | Confidential | Apr 2019 |
D3.2 | Best practices for blast vibration reduction. Topographic subsurface model for ERZBERG mine and recommendations of blast patterns that minimize PPV at sensitive targets in the mine, including a catalogue of expected vibration patterns for representative blast layouts at ERZBERG. | MUL | Confidential | Oct 2019 |
D3.3 | Generation and mitigation of air-borne dust (1). Preliminary version of Particulate matter control procedures and mitigation measures | MUL | Confidential | Oct 2018 |
D3.4 | Drill hole lining-while-charging (LWC) technique. A 3D-printed ContBlast unit design that confines columns of emulsion charges in normal Ø76-89 mm quarry holes in fractured and wet ground | MUL | Confidential | Oct 2017 |
D3.5 | Verification tests. A set of common recommendations for minimal rock damage, blast vibrations and dust. | MUL | Confidential | Oct 2020 |
D3.6 | Generation and mitigation of air-borne dust (2). Complete and final version of Particulate matter control procedures and mitigation measures | MUL | Confidential | Apr 2019 |
D4.1 | New practices for using emulsion explosive in complex ore mining. Report to show how explosives influence blast design and performance | MAXAM | Confidential | Oct 2018 |
D4.2 | Technical report for reducing ammonium nitrate leaching. Report showing the behaviour of explosives to reduce A.N leaching | MAXAM | Confidential | Oct 2018 |
D4.3 | Module integration report. Report on the integration of the explosives characteristics module, rock hardness module and fragmentation prediction module into blast design software | MAXAM | Confidential | May 2019 |
D5.1 | Muck pile characterisation software requirements (1). Software components for muck pile characterisation and documentation. Report on UAV data collection procedure and analysis results for on-site tests. First evaluation report | 3GSM | Confidential | Dec 2018 |
D5.2 | Blast design software based on rock mass characterisation (1) Software component for automatically positioned blast holes based on surveyed bench faces. Software component for automatic identification of rock mass structures (discontinuities). Software component integration of the former. First field testing report and field testing evaluation report | 3GSM | Confidential | Oct 2017 |
D5.3 | Muck pile characterisation software requirements (2). Software components for muck pile characterisation and documentation. Report on UAV data collection procedure and analysis results for on-site tests. Second evaluation report | 3GSM | Confidential | Oct 2020 |
D5.4 | Blast design software based on rock mass characterisation (2). ‘Software component for automatically positioned blast holes based on surveyed bench faces. Software component for automatic identification of rock mass structures (discontinuities). Software component integration of the former. | 3GSM | Confidential | Oct 2018 |
D5.5 | Blast design software based on rock mass characterisation (3). ‘Software component for automatically positioned blast holes based on surveyed bench faces. Software component for automatic identification of rock mass structures (discontinuities). Software component integration of the former. | 3GSM | Confidential | Oct 2019 |
D5.6 | Blast design software based on rock mass characterisation (4). Software component for automatically positioned blast holes based on surveyed bench faces. Software component for automatic identification of rock mass structures (discontinuities). Software component integration of the former. Field testing report and field testing evaluation report | UPM | Confidential | Oct 2020 |
D6.1 | Set of monitoring KPIS. Final KPI list, admissible working ranges and selected monitoring/validation techniques | UPM | Confidential | Dec 2018 |
D6.2 | Trial results final report. Final report on the validation phase in ORGIVA and ERZBERG, KPI monitoring and overall system performance and validity | UPM | Confidential | Oct 2020 |
D6.3 | Best practices and data portfolio. Compendium of best practices and lessons learned throughout the validation phase, including a data portfolio specifying all valid default input formats for data recollection, analysis and exploitation | UPM | Confidential | Oct 2020 |
D7.1 | LCA goal and scope. Report on the goal and scope definition of the LCA study | BRGM | Confidential | Apr 2017 |
D7.2 | Scientific publication on LCA. The LCA study is presented in a scientific publication and submitted | BRGM | Confidential | Oct 2020 |
D7.3 | Cost–benefit analysis manual. An easy to use practical guide in conducting cost-benefit analysis for the mining sector. | InvestorNet | Confidential | Oct 2018 |
D7.4 | Innovation management guidelines and results. An easy to use practical guideline for implementation innovation management processes, together with a summary of results from innovation management processes conducted. | InvestorNet | Confidential | Oct 2020 |
D7.5 | Business opportunity identification. Summary of findings and conclusions from analysis of business opportunities, together with the overarching exploitation plan and strategies developed during the project’s execution. | InvestorNet | Confidential | Oct 2020 |
D7.6 | Exploitation and application strategy and open access. Summary of identifies exploitation strategies. Input for dissemination of non-commercial project results and methodologies. | InvestorNet | Confidential | Oct 2020 |
D8.1 | Communication and dissemination plan. The deliverable will contain all measures that SLIM will use for disseminating the project objectives, methods and results to all stakeholders concerned and identified and to the scientific, technical and general public. | MINPOL | Confidential | Jan 2017 |
D8.2 | Report about results of stakeholder communication activities on EU level. The deliverable with describe the methods used for the communication activities on EU level, the stakeholders involved and the results of the activities. | MINPOL | Confidential | Jul 2020 |
D8.3 | Report about results of stakeholder communication activities on local level. The deliverable with describe the methods used for the communication activities on local level, the stakeholders and public groups involved and the results of the activities. | MINPOL | Confidential | Jul 2020 |
D8.4 | Report on activities of the press bureau including media monitoring report. The report will summarise the activities of the ‘press bureau’ and the media interaction activities. | MINPOL | Confidential | Jul 2020 |
D8.5 | SCIENTIFIC PUBLICATIONS AND PAPERS (1). Relation of all planned scientific publications and papers on the project’s topic. | MINPOL | Public | May 2019 |
D8.6 | SCIENTIFIC PUBLICATIONS AND PAPERS (2). Updated relation of all planned scientific publications and papers on the project’s topic. | MINPOL | Public | Oct 2020 |
D9.1 | Networking efforts and stakeholders review. Compendium of all networking progress and list of stakeholders contacted | UPM | Confidential | May 2019 |
D9.3 | Advisory board interaction | UPM | Confidential | Sept 2020 |
D10.1 | Best practices on social awareness communication. Report on best practice analysis for communication procedure based off 5 relevant use cases on social awareness | ZABALA | Public | Oct 2018 |
D10.2 | Social awareness guidelines for local communities. Guidelines on social awareness communication and interaction with local communities located in close proximity to targeted mines | ZABALA | Public | Oct 2018 |
D10.3 | Educational programme on social awareness. Results from the proposed use cases and recommendation on sustainable responsible mining | ZABALA | Public | Oct 2020 |
D10.4 | Report on use cases results and recommendations. Results from the proposed use cases and recommendation on sustainable responsible mining | ZABALA | Public | Oct 2020 |